Perth to Mandurah Rail Link
The Perth to Mandurah Rail Link project expanded the rail network between Perth and Mandurah. The program of works incorporated the design and construction of 70 kilometres of double track, 14 bridges, two underpasses and all signalling for the network. John Holland engaged Fremantle Constructions to assist in the construction of nine (9) bridge structures, tunnels and track slabs. Some of our work conducted on this project included: Erection of MSE panels and precast panels Installation of parapets Installation of expansion joints, skirt beams, crash barriers Building of insitu walls, both straight and curved.
